Our Products for 12 0 tons office building biogas boiler condenser

Chillers - Trane

08/09/2004 · LANL Standard Drawings and Details either (1) depict required format/content or (2) are templates that are completed by a Design Agency (LANL or external AE) for a design drawing package, in a manner similar to specifications.

Get A Quote

HVAC Rule of Thumb Calculator - Engineering Pro Guides

1 Btu/h = 8.33 x10-5 tons 1 ton = 12,000 Btu/h 1 Btu/h the first figure, you can see that the heat rejection at the evaporator and condenser change from air to water as you move from split system to water cooled chilled water system. This change in heat rejection from air to water greatly improves the efficiency because the heat transfer is much better with water due to its increased heat

Get A Quote

High-Performance HVAC | WBDG - Whole Building Design Guide

The European Bank for Reconstruction and Development (EBRD) is a 13 storey office building. The existing cooling system within the building consists of 3No YORK water cooled chillers installed around 1989, located in the ground floor plant room. Condenser water for the chillers is provided from 4No roof mounted open circuit evaporative cooling towers. There are existing heat exchangers within

Get A Quote

Biomass for Electricity Generation | WBDG - Whole Building

07/11/2016 · For example, a typical office building minimally complying with the ASHRAE Standard 90.1 might use 75,000 Btu/sq.ft./yr. The goal for many federal buildings is 50,000 Btu/sq.ft./yr. A highly energy-efficient building using conventional comfort could have an energy use of 40,000 Btu/sq.ft./yr. or even less. A building designed and operated with

Get A Quote

Engineering Standards Manual: Standard Drawings & Details

Adjusted maximum full load kW/ton rating = [full load kW/ton from Table 503.2.3(7)]/K adj Adjusted maximum NPLV rating = [IPLV from Table 503.2.3(7)]/K adj where: K adj = 6.174722 - 0.303668(X) + 0.00629466(X) 2 - 0.000045780(X) 3 X = DT std + LIFT DT std = {24+[full load kW/ton from Table 503.2.3(7)] × 6.83}/Flow Flow = Condenser water flow (GPM)/Cooling Full Load Capacity (tons) LIFT = …

Get A Quote

Heating for 70,000 square meters gas boiler heating costs

heater in the office building. However, boiler consump- tion is by far the greatest user of natural gas, consuming an estimated 90% of the 85,743 MCF ($254,102) used from June 1980, to May 1981. Steam from the boiler was used by the chiller, presses, unit heaters, office HVAC system and in the laboratory. Gas cost for May 1981. was $3.32/MCF. Between June 1980, and May 1981. the plant uscd

Get A Quote

. additions in 1966

Each building has its own unique set of conditions required to ensure the health, comfort and productivity of its occupants. Our chillers serve HVAC systems that deliver the right temperature, humidity and ventilation for the space, but they also help minimize operating costs with superior energy efficiency levels, low sound levels and with minimal environmental impact.

Get A Quote

MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION

The standard reference design boiler plant shall be modeled with a single boiler where the standard reference design plant load is 600,000 Btu/h or less and with two equally sized boilers for plant capacities exceeding 600,000 Btu/h. Boilers shall be staged as required by the load. Piping losses shall not be modeled in either building model. Pump system power shall be the same as the

Get A Quote

Building Specifications | UpCodes

29/01/2019 · Heating for 70,000 square meters. heating buildings include factory,office and house,which are the most consulted.But there are differences between factory building and office or residential in heating cost.Under the same area, factory builds need a bigger heating boiler to supply heat and required more energy consumption due to the heat loss of factory is larger.

Get A Quote

Related 12 0 tons office building biogas boiler condenser Information